Demo site: business details, reviews and projects are sample content to be replaced.
Skip to content
Summit Roofing Co.

Project

Full replacement on a two-story colonial

Two layers of worn shingles replaced with architectural shingles and copper-toned gutters.

Before: Full replacement on a two-story colonial
Before
After: Full replacement on a two-story colonial
After
Job type
Roof replacement
City
Springfield, ST
Material
Architectural asphalt shingles

Work performed

  • Tore off two layers to the deck
  • Replaced 6 sheets of soft decking
  • Installed ice & water shield at eaves and valleys
  • New architectural shingles and ridge vent
“Dan walked the roof with me and showed me photos of every problem. The crew was careful with my garden and cleaned up every nail.”
Karen M., SpringfieldView on Google · demo review

Related questions

How do I know if I need a repair or a replacement?

It depends on the roof's age, how widespread the damage is, and whether there are multiple layers. We'll show you photos and give written options for both when both make sense.

How long does a roof replacement take?

Most single-family homes take one to three days of work, depending on size, weather, and decking repairs found during tear-off.

Have a similar project?

Tell us what's going on and we'll set up an inspection.

CallFree estimate